This first building of three, is the new Shop/Office for
Leinneweber Services – Septic Pumping and
Construction Site Toilet Rental
![20210520_111105](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210520_111105-scaled.jpg)
Of course a solid engineered foundation is the first step.
From the ground up, It’s Just a lot of work.
With a large building like this, it takes a lot of material and
equipment to build up the grade for a nice flat slab.
![20210604_125911 20210604_125911](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210604_125911-scaled-600x450.jpg)
Long straight and level exterior beams.
Just Getting Started
![20210819_075514 20210819_075514](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20210819_075514-scaled-600x450.jpg)
Inspections are now complete and all systems are
ready to now let the concrete flow!
![20210819_084021 20210819_084021](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20210819_084021-scaled-600x450.jpg)
Now, that looks like a real “cush” job,
None of that old school wheel borrow business here.
![20210820_093851 20210820_093851](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210820_093851-scaled-600x450.jpg)
Now, that’s a nice looking slab
Watch out for the oil pit, it’s about 6′ deep
![20210907_113713 20210907_113713](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210907_113713-scaled-600x450.jpg)
Now that the flat is done, It’s time to go vertical.
This is a weld up building rather than a bolt up
for some pretty good reasons.
![20210914_115148 20210914_115148](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210914_115148-scaled-600x450.jpg)
As you can see, we are building a mezzanine.
Office space on the first floor and storage &
mechanical equipment above.
![20210916_110702 20210916_110702](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210916_110702-scaled-600x450.jpg)
Steel girders for the floor/ceiling structure.
![20210923_110018](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210923_110018-1024x768.jpg)
The only way to get the decking up to the mezzanine floor.
![20210929_094245](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210929_094245-1024x768.jpg)
Time to get the roofing & siding panels on.
Let’s get this building closed In!
![20210927_101449](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20210927_101449-1024x768.jpg)
Notice the 2 color scheme on the siding panels.
It’s a good Idea to mix it up to create a little style.
![20211001_112203 20211001_112203](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20211001_112203-scaled-600x450.jpg)
Roll up doors are next in line.
![20211004_094121](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20211004_094121-1024x768.jpg)
We installed the air handler unit as a strategic move
before this end was closed in. A lot easier access!
![20211006_110514](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20211006_110514-1024x768.jpg)
Metal stud framing for the office area is the next order of business.
![20211006_110815 20211006_110815](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20211006_110815-scaled-600x450.jpg)
Along with all the other action, the 25,000 gallon fire suppression
storage tank is installed.
![20211025_111823 20211025_111823](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2021/10/20211025_111823-scaled-600x450.jpg)
It’s always a good Idea to have a good water source to
fill the storage tank along with all the other water
needs of a thriving business.
![20211006_110636 20211006_110636](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20211006_110636-scaled-600x450.jpg)
![](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20211026_100809-scaled-600x450.jpg)
Interior walls for the office are metal studs.
![20211101_100548 20211101_100548](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20211101_100548-scaled-600x450.jpg)
Meanwhile the exterior is getting finished up and the truck yard
is getting prepared for a whole lot of concrete.
![20211101_100700 20211101_100700](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20211101_100700-1-scaled-600x450.jpg)
The front entry area is starting to take shape as well.
![20211105_115307 20211105_115307](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20211105_115307-scaled-600x450.jpg)
The office area gets drywall hung, tape, floated and textured.
![20211105_115256 20211105_115256](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20211105_115256-scaled-600x450.jpg)
Taking care of some details in the shop up on the scissor lift.
![20211202_084213 20211202_084213](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20211202_084213-scaled-600x450.jpg)
Getting ready to pour a lot more concrete
for the parking and shop yard.
We wanted 300 yards from the concrete batch plant
but they ran out before we could get it all.
Sometimes that happens and so we go to plan “B”
![20211230_094523 20211230_094523](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20211230_094523-scaled-600x450.jpg)
The front gets a covered area for executive parking.
![20220110_110626 20220110_110626](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20220110_110626-scaled-600x450.jpg)
Steel stairs to access the mezzanine
where all sorts of things are stored.
![](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20220128_0959461-scaled-600x450.jpg)
A shop view from up on the mezzanine.
![20220128_100005[1] 20220128_100005[1]](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20220128_1000051-scaled-600x450.jpg)
A view of the mezzanine above the office.
A great place to store all sorts of needed stuff.
![20220112_125424 20220112_125424](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20220112_125424-scaled-600x450.jpg)
Getting down to the odds and ends now that the
concrete flatwork is finished.
Maybe that should be my personal parking spot 🙂
![20220114_094502 20220114_094502](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20220114_094502-scaled-600x450.jpg)
Steel parking cover is nicely situated.
![20220124_110553 20220124_110553](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20220124_110553-scaled-600x450.jpg)
![20220124_110605 20220124_110605](https://hillcountrybuildingandrenovation.com/wp-content/uploads/2022/01/20220124_110605-scaled-600x450.jpg)
The owners were so anxious to get moved in and situated
we hardly had a chance to get all cleaned up.
With the exception of a couple of punch list items the
Shop/Office phase is now complete.
Come on in and have a look.