This is actually a Light Industrial Building built in conjunction
With a new Commercial Complex we recently completed for
Leinneweber Services. See That Project Highlight HERE
They are using this building temporarily to house their
RV Bus while building a new residence.
The Beginning Stages.
You can see in the background the
commercial complex we recently finished.
And this is the Building in Completion.
Foundation, slab and under slab plumbing
Ready for laying some concrete down.
In this current COVID construction environment,
You get concrete when it is available.
Today, that starts at 5:00 am.
The sun is coming up and the trucks have
emptied 250 yards of concrete.
Finishing concrete right,
It’s an art form for sure!
The forms come off and we have a real solid slab ready to start erecting the steel structure for this building.
All the erection equipment is on site, so, lets get this building going.
Getting the balcony built on the left side.
These scissor lifts are really handy when you to get high.
That is high in the air, of course.
After the structure is complete, the insulation, covered in a durable PVC covering is sandwiched between the structure and the R-Panel metal sheet siding which is then screwed onto the wall purlins through the insulation.
Installing the roll up door.
In this case, 2 scissor lifts are preferable.
This is the mezzanine structure for the living space
on the second floor.
Metal studs for the walls upstairs.
Studs and stairs, ready for plumbing, HVAC and electrical.
With these huge windows, getting them upstairs is a real trick.
Good thing we have a scissor lift on site.
Slide that bad boy into place.
These are not your garden variety Windows.
They are spendy, but well worth the price!
They are so very nice!!
Now with the plumbing, electrical, and insulation completed,
it’s time to hang the drywall.
With all the windows and doors installed and drywall textured,
you can begin to feel the living space with the fantastic view.
It has taken a lot to get here, but well worth the ride.